Why high‑rises are different: six core challenges
- Vertical evacuation complexity: Evacuating many floors is slower and more complicated than evacuating a single level. Stairs, pressurisation and phased evacuation strategies all matter.
- Fire spread via vertical shafts and façades: Risers, service shafts, mechanical rooms and cladding systems can allow fire and smoke to travel quickly between floors.
- Complicated fire detection and alarm networking: Long wiring runs, multiple detection zones and the need for reliable networked alarm panels increase design complexity.
- Smoke control and pressurisation failures: Multi-zone HVAC and stack-effect winds can defeat smoke control strategies if not designed and commissioned correctly.
- Access for firefighters: High-rise firefighting relies on interface points at street level, rooftop access and internal hydrants and pump systems, all must be coordinated.
- Human factors and occupant behavior: Mixed uses (residential, commercial, retail) and transient populations create unpredictable evacuation behaviours.
Case Study A: Residential Tower: Delayed Detection and Shaft Spread
Project profile: 42-storey residential tower, mixed apartments and podium retail. New construction with modern glazing and full-height risers for MEP services.
Problem observed: During commissioning smoke tests, a small fire-starting simulation on Level 18 caused rapid smoke migration to Levels 21-24 via an adjacent service shaft. Building management later identified that some detectors on Level 18 were slow to alarm because of incorrect sensitivity settings and an incorrectly zoned loop.
Root causes:
- Service shaft lacked continuous fire-stopping at multiple floor penetrations.
- Detector sensitivity settings were defaulted for open-plan offices rather than furnished apartments with lower ceiling heights and different aerosol signatures.
- Zoning design grouped multiple floors together, increasing the time before localised alarms reached the central monitoring station.
Engineered solutions implemented:
- Installed continuous intumescent fire-stopping and mineral wool seals at all shaft penetrations; contractor issued corrective snag lists and re-worked penetrations.
- Re-calibrated and re-located smoke detectors to better-match apartment ceiling geometries and transitioned to multi-criteria detectors in corridors.
- Re-designed detection zoning so each floor had an independent fire zone and a local annunciator panel in the stair lobby for quick firefighter orientation.
Outcomes & lessons:
- Proper fire-stopping and prioritised zoning dramatically reduced vertical smoke transfer and improved alarm response time.
- Commissioning must include realistic smoke tests and detector sensitivity audits that reflect the actual occupancy and contents.
Case Study B: Mixed-use tower: Smoke Control Failure Under Stack Effect
Project profile: 35-storey mixed-use building (retail podium, offices, residences) near a coastal location with high daily temperature swings.
Problem observed: On a hot day, a small electrical fire on Level 10 produced smoke that migrated upward rapidly through stairwells and elevator lobbies, defeating the mechanical smoke extract system. The stack effect and open shaft doors caused smoke transfer to upper office floors.
Root causes:
- HVAC dampers and stairwell pressurisation controls were not properly integrated with the fire-alarm system; they failed to shift to fire mode.
- Temporary contractor changes to door closers and lobby airflow introduced unexpected leakage paths.
- The smoke-control design relied on a single extract fan without redundancy.
Engineered solutions implemented:
- Integrated the smoke-control system with the fire alarm control panel (FACP) with clear state diagrams and fail-safe logic: on alarm, extract fans and pressurisation operate to pre-defined setpoints.
- Added redundancy: secondary fans and backup power were installed for critical smoke extraction systems.
- Re-assessed air tightness of doors and corrected door closer settings; installed smoke seals on lobby doors.
- Performed dynamic smoke modelling and full-scale smoke tests to validate performance under realistic stack-effect conditions.
Outcomes & lessons:
- Integration between HVAC controls and the FACP is non-negotiable for tall buildings.
- Redundancy and regular dynamic testing (not just static checks) catch failures that static commissioning misses.
Case Study C: Office tower: Alarm Communication Failure During Power Transition
Project profile: 50-storey Class A office tower with central building management and an offsite monitoring station.
Problem observed: During a scheduled generator test, primary power was taken offline and emergency power transfer caused momentary communication loss between the building’s alarm panels and the offsite monitoring station. Several remote annunciations failed to show a local alarm condition for 90 seconds.
Root causes:
- Networked alarm panels used active POE switches located on the primary power bus without a proven backup path.
- The switchover logic on the building controller momentarily disabled the alarm network while re-initialising network hardware.
- Offsite monitoring relied on a single cellular gateway that briefly dropped during transfer.
Engineered solutions implemented:
- Restructured the network topology with ring redundancy and UPS-backed switches for alarm-critical devices.
- Implemented hot-standby communication gateways (dual cellular and a VPN over fibre) so one path remained live during any transition.
- Revised the generator control logic to preserve communication power to alarm-critical equipment during transfer.
Outcomes & lessons:
- Network architecture for alarm and life-safety devices must assume the worst-case, design to maintain connectivity during power transitions.
- Test generator transfer under real spectral network conditions and monitor alarm path continuity as part of commissioning.
Practical Design & Operational Recommendations
Below are distilled recommendations that emerged across multiple projects and are applicable to new builds and retrofits.
1. Treat shafts, Penetrations and Façades as Primary fire paths
- Require continuous fire-stopping, inspect penetrations after every contractor workpackage and include sign-off in the snagging process.
- For façades, use tested systems and detail window-to-panel joints and cavity barriers.
2. Use floor-level zoning and clear annunciation
- Use a zoning strategy that allows firefighters to locate the source quickly (floor-by-floor zones or sub-zones for large floors).
- Provide clear local annunciators at stair lobbies and entrance control rooms.
3. Integrate HVAC, smoke control and the FACP early
- Specify clear control sequences in the tender documents and test them in commissioning with full-scale smoke tests.
- Add redundancy to fans and power supplies for critical smoke-control equipment.
4. Design resilient alarm networks and power arrangements
- Isolate life-safety networks from general IT networks and provide UPS and generator continuity for critical components.
- Use redundant communication paths to monitoring stations (fibre + cellular + satellite when appropriate).
5. Account for human behaviour and mixed occupancy
- Produce tailored evacuation procedures for each occupancy type and run occupant drills regularly.
- Design stair pressurisation and wayfinding to guide occupants safely even under smoke conditions.
6. Commission with realistic testing and schedule periodic re-checks
- Dynamic tests: perform full-scale smoke tests, stair pressurisation tests and generator transfer tests while monitoring life-safety communications.
- Periodic re-commissioning (every 3–5 years) ensures systems still work after incremental changes to services and tenant fit-outs.
7. Documentation, training, and change control
- Keep up-to-date drawings, O&M manuals and a change-control register for any penetration or ductwork work.
- Train facilities staff, security and local fire service on equipment locations, normal/failed states and manual overrides.
Quick checklist for project teams (ready-to-use)
- Continuous fire-stopping at all shafts and penetrations
- Floor-by-floor detection zoning and corridor annunciation
- FACP integration with HVAC/smoke-control with documented sequences
- Redundant extract fans and UPS/generator for critical systems
- Separate life-safety network with UPS-backed switches and ring topology
- Full-scale dynamic smoke and pressurisation commissioning tests
- Occupant-specific evacuation plans and periodic drills
- Documented change control and post-construction re-commissioning schedule
High-rise fire safety demands holistic thinking: robust compartmentation, carefully zoned and reliable detection/notification, integrated smoke-control, resilient networks and human-centred evacuation planning. The anonymized case studies above show how small oversights compound into serious risks and how targeted engineering corrections prevent reoccurrence.
Designers and owners should prioritise early integration between disciplines, realistic dynamic commissioning, redundancy for life-safety equipment and clear documentation coupled with staff training. These steps transform reactive buildings into resilient high-rise assets.
Frequently Asked Questions
Q: Can modern sprinklers replace smoke detection in high-rises?
A: No. Sprinklers limit fire spread and reduce heat release, but detection and early warning are essential to manage smoke, evacuation, and life-safety communications. Both systems are complementary.
Q: How often should a high-rise be re-commissioned for fire safety?
A: Re-commission every 3–5 years as a best practice, and immediately after major tenant fit-outs or MEP changes.
Q: Is stairwell pressurisation enough to stop smoke spread?
A: Only if designed, commissioned, and maintained correctly. Pressurisation must be validated under expected temperature and wind conditions and after doors or HVAC changes.
Read Also: How Engineers Integrated Fire Alarm, CCTV and Access Control in a Single ELV Platform
Read Also: Fire Alarm System Design for Large-Scale Manufacturing Plants